Home / All / Steel Bars / Tool Steel Bars /

1.4528, X105CrCoMo18-2, Stainless Plastic Mould Tool Steel Bar

1.4528, X105CrCoMo18-2, Stainless Plastic Mould Tool Steel Bar

1.4528, X105CrCoMo18-2, Stainless Plastic Mould Tool Steel Bar
CategoriesTool Steel Bars
Brandfushun
Processhot rolled or hot forged
Delivery Condtionannealed
Surface Conditionsmooth, bright
FOB portShanghai
Terms of PaymentL/C, T/T
Update TimeApr 28,2024
Detail Information

1.4528, X105CrCoMo18-2, Stainless Plastic Mould Tool Steel

 

Product Description

Corrosion-resistant, martensitic chromium steel with high carbon-content, cobalt-, molybdenum- and vanadium-addition.

TOOL STEELS

HARDENABLE CORROSION RESISTANT STEEL

Plastic Mould Cold Work

 

Properties

Toughness & Ductility : good

Wear Resistance : very high

Machinability : good

Dimensional stability : good

Polishability : good

Corrosion resistance : high

 

Applications

Packaging

Food industry like extrusion screws, can closing rolls

Screws for plastic injection and back flow valves

Cutting-typical instruments and knives Moulds for plastic injection (PIM)

Pharmaceutical industry like pill punches and –dies

Extrusion screws for plastic processing

PIM and screws for processing of GF-reinforced plastics

Hot runner systems

 

Material designation

1.4528

X105CrCoMo18-2

 

Chemical composition (wt. %)

C

Si

Mn

Cr

Mo

V

Co

1.08

0.40

0.40

17.30

1.10

0.10

1.50

 

Delivery condition

Annealed Hardness (HB) max. 285

 

Heat treatment

Stress relieving

Temperature 650 °C | 1,202 °F After warming up completely, keep at temperature for 1 to 2 hours in a neutral atmosphere. Slow furnace cooling

 

Hardening and Tempering

Temperature 1,000 to 1,060 °C | 1,832 to 1,940 °F  Holding time after complete soaking, max. 30 minutes / 25 mm cross section.

Temperature 150 to 350 °C | 302 to 662 °F Tempering treatment required after hardening to the desired working hardness. Tempering of min. 2h after complete soaking. Tempering shall be made immediately after hardening. After each tempering a cooling RT shall be done.

 

KeyWords
Please send your message to us
*Email
Tel
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.
CONTACT PERSON
Name:
Florence Tang
Tel:

86-731-89903933

Email:
Address:
ADD: No. 812-813, Floor 8, Building C2, Yongsheng Commercial Plaza, 222 Labor East Road, Yuhua District, Changsha City, Hunan, China.
NEWSLETTER

sign up for the latest catalogue, new design and promotion

follow us